They were able to get a ton of pictures, which was amazing.
In the pictures, note the orange paint. That means my PM doesn't like something and is making the contractor fix it. When it's done, he paints it black. If he still hates it, he paints it green and they fix it a third time.
Basement
Basement egress window
Furnace
Morning room
Door from morning room
Family room
View from kitchen through mudroom to garage
Upstairs bathroom
We also chatted with our PM Friday after work because he needed to confirm our availability to come in the week of the 4th for our pre drywall walkthrough (what?). We will be going in at 9am Thursday to do the walkthrough, which means we have to leave Virginia Wednesday after work (4pm) to do the 9 hour drive. If we had been able to have more notice, we would have flown, but will deal.
Exciting that you'll get to be there for the pre drywall meeting! Hope your drive goes smoothly!
ReplyDeleteTrane 16 seer installation Thanks for a very interesting blog. What else may I get that kind of info written in such a perfect approach? I’ve a undertaking that I am simply now operating on, and I have been at the look out for such info.
ReplyDelete